ANAN G2 1K5 Shipping Update
Hi All,
I am posting this on the forum and not via email since we have been having some issues with the email which our web team is working on fixing at the moment.
Thank you for your patience with the 1K5. My apologies for posting this update a little late, I have been a little unwell with the Flu but on the mend now!
As mentioned in my last update we are in the final production stages of the 1K5 and since this is our first high power model we are also learning on the go, what we don't want to do is leave any weak link in the chain before we ship your units out.
We were using a 53v 50A PSU for the radio which was maxing out on some of the higher bands, since the current capacity is even lower at 110v this was also not adequate for 800W output as specified at 110v operation, our supplier has been kind enough to replace these with 53v 75A units which work as required for full 1500W output (220v) and 800W (110v). Since the footprint is exactly the same no changes were needed to the chassis and we are now awaiting delivery of the 75A PSUs. We expect delivery of the upgraded PSUs in 2-3 weeks, we expect to take about a week to fit and finalize assembly of the radios once the PSUs have been received.
There will not be any additional charge for the PSU upgrade and Apache Labs will absorb the price difference.
Regards,
Abhi
I am posting this on the forum and not via email since we have been having some issues with the email which our web team is working on fixing at the moment.
Thank you for your patience with the 1K5. My apologies for posting this update a little late, I have been a little unwell with the Flu but on the mend now!
As mentioned in my last update we are in the final production stages of the 1K5 and since this is our first high power model we are also learning on the go, what we don't want to do is leave any weak link in the chain before we ship your units out.
We were using a 53v 50A PSU for the radio which was maxing out on some of the higher bands, since the current capacity is even lower at 110v this was also not adequate for 800W output as specified at 110v operation, our supplier has been kind enough to replace these with 53v 75A units which work as required for full 1500W output (220v) and 800W (110v). Since the footprint is exactly the same no changes were needed to the chassis and we are now awaiting delivery of the 75A PSUs. We expect delivery of the upgraded PSUs in 2-3 weeks, we expect to take about a week to fit and finalize assembly of the radios once the PSUs have been received.
There will not be any additional charge for the PSU upgrade and Apache Labs will absorb the price difference.
Regards,
Abhi
Re: ANAN G2 1K5 Shipping Update
Hi Abhi, wanted to ask about the status of the required FCC certification for the amplifier. Will it be completed in time for shipment to the US in June?
Thanks,
Thanks,
W6MY - Chip
Re: ANAN G2 1K5 Shipping Update
Nice that he gave update .
Joe
Joe
Re: ANAN G2 1K5 Shipping Update
administrator wrote:Hi All,
I am posting this on the forum and not via email since we have been having some issues with the email which our web team is working on fixing at the moment.
Thank you for your patience with the 1K5. My apologies for posting this update a little late, I have been a little unwell with the Flu but on the mend now!
As mentioned in my last update we are in the final production stages of the 1K5 and since this is our first high power model we are also learning on the go, what we don't want to do is leave any weak link in the chain before we ship your units out.
We were using a 53v 50A PSU for the radio which was maxing out on some of the higher bands, since the current capacity is even lower at 110v this was also not adequate for 800W output as specified at 110v operation, our supplier has been kind enough to replace these with 53v 75A units which work as required for full 1500W output (220v) and 800W (110v). Since the footprint is exactly the same no changes were needed to the chassis and we are now awaiting delivery of the 75A PSUs. We expect delivery of the upgraded PSUs in 2-3 weeks, we expect to take about a week to fit and finalize assembly of the radios once the PSUs have been received.
There will not be any additional charge for the PSU upgrade and Apache Labs will absorb the price difference.
Regards,
Abhi
ABHI, THANK YOU for the update!
Praying that you feel better.
Blessings & 73,
David
WR4N
ANAN 7000 DLE MKIII
Thetis 2.10.3.6 x64 (1/28/24) dev_2
HP VICTUS (Gaming Laptop) - Intel Core i7 - 16GB memory - 512GB SSD - NVIDIA Graphics - WINDOWS 10
Best 73s,
WR4N - David
Thetis 2.10.3.6 x64 (1/28/24) dev_2
HP VICTUS (Gaming Laptop) - Intel Core i7 - 16GB memory - 512GB SSD - NVIDIA Graphics - WINDOWS 10
Best 73s,
WR4N - David
Re: ANAN G2 1K5 Shipping Update
KL4QG wrote:Nice that he gave update .
Joe
And it is very nice to now have a “TOPIC” specifically for:
“ANAN G2 1K5 Shipping Update”
This should clear up some of the confusion.
ANAN 7000 DLE MKIII
Thetis 2.10.3.6 x64 (1/28/24) dev_2
HP VICTUS (Gaming Laptop) - Intel Core i7 - 16GB memory - 512GB SSD - NVIDIA Graphics - WINDOWS 10
Best 73s,
WR4N - David
Thetis 2.10.3.6 x64 (1/28/24) dev_2
HP VICTUS (Gaming Laptop) - Intel Core i7 - 16GB memory - 512GB SSD - NVIDIA Graphics - WINDOWS 10
Best 73s,
WR4N - David
Re: ANAN G2 1K5 Shipping Update
We have to be happy, now the delay is "only" of 2-3 weeks...
Re: ANAN G2 1K5 Shipping Update
Hihi
Well there’s a light in the tunnel. Don’t know if we’re getting close to the end of the tunnel or if it’s a train.
I would think they would turn loose of a few radios at the end of next month. See if those radios holdup to the abuse I’m sure some hams are going to give it. If no Problems !! Which I would be amazed since this is the first 1500 W radio made for ham radio use . I would think most of us would see the radio toward the end of summer . They might be some slight design changes, but I imagine everything‘s pretty well good to go.
So don’t expect your radio in 30 days It easily could be 90 days out for most of us. Who knows maybe I’ll get surprised, but I doubt it the way the electronic parts supply chain is now if one small hiccup , we need a different part. It could be a major delay I know. Sourcing Parts right now is unreal even power supply capacitors from major manufactures are still somewhere to 48 weeks out!
Being this is almost 2 years I’d say this is pretty reasonable for a new product , specially from a small company. I don’t think you’re gonna see anybody else tackle a radio like this , specially at this price!
So complain all you want to . I’m just happy to see a little progress made every few months I know eventually with a little progress every few months we will get a radio. I would’ve been more than happy with a 500 W radio 1500 W radio wait a year and a half I’d say a pretty reasonable deal!
73 AC9PA
Well there’s a light in the tunnel. Don’t know if we’re getting close to the end of the tunnel or if it’s a train.
I would think they would turn loose of a few radios at the end of next month. See if those radios holdup to the abuse I’m sure some hams are going to give it. If no Problems !! Which I would be amazed since this is the first 1500 W radio made for ham radio use . I would think most of us would see the radio toward the end of summer . They might be some slight design changes, but I imagine everything‘s pretty well good to go.
So don’t expect your radio in 30 days It easily could be 90 days out for most of us. Who knows maybe I’ll get surprised, but I doubt it the way the electronic parts supply chain is now if one small hiccup , we need a different part. It could be a major delay I know. Sourcing Parts right now is unreal even power supply capacitors from major manufactures are still somewhere to 48 weeks out!
Being this is almost 2 years I’d say this is pretty reasonable for a new product , specially from a small company. I don’t think you’re gonna see anybody else tackle a radio like this , specially at this price!
So complain all you want to . I’m just happy to see a little progress made every few months I know eventually with a little progress every few months we will get a radio. I would’ve been more than happy with a 500 W radio 1500 W radio wait a year and a half I’d say a pretty reasonable deal!
73 AC9PA
Re: ANAN G2 1K5 Shipping Update
It's the old "if everything goes well" date syndrome.
Fortunately some good testing is finding problems before they ship out the 1st units.
We are converging on 0 days though!!
Fortunately some good testing is finding problems before they ship out the 1st units.
We are converging on 0 days though!!
Mike W9MDB
Re: ANAN G2 1K5 Shipping Update
I wish everyone well my G2 money was returned via PayPal it’s not 1.5 K watt model but I feel for you guys -
I don’t believe kissing up to Apache Labs going help with your delivery.any faster-
If you want action put a PalPal claim in i can say than your get asap response .
I decided wait till Flex unveils their new SDR transceiver on May 17-18 -I need a tree rooted company and customer service .
Again I’ll Pray for you All
Joe in Alaska KA2ZSD
I don’t believe kissing up to Apache Labs going help with your delivery.any faster-
If you want action put a PalPal claim in i can say than your get asap response .
I decided wait till Flex unveils their new SDR transceiver on May 17-18 -I need a tree rooted company and customer service .
Again I’ll Pray for you All
Joe in Alaska KA2ZSD
Re: ANAN G2 1K5 Shipping Update
Well if you want to pay an extra $7000 for 3dB of gain OK.
Not worth over twice the price and twice the space in my book.
Not worth over twice the price and twice the space in my book.
Mike W9MDB
Re: ANAN G2 1K5 Shipping Update
Are there two power supply’s in 1K G2 one power supply for transceiver and secondary power supply for amplifier ?
Or do you lose the total system if amplifier has problems .
Will there be parts available for USA repair center .
Joe KA2ZSD Alaska
I’m thinking maybe that holding up shipping also parts availability
Or do you lose the total system if amplifier has problems .
Will there be parts available for USA repair center .
Joe KA2ZSD Alaska
I’m thinking maybe that holding up shipping also parts availability
Re: ANAN G2 1K5 Shipping Update
Looks like this week should be the big one. First post in this thread was on May 15th. Two to three weeks for receipt of the upgraded power supplies. And one more week for proper fitment and testing. That is now behind us, so notice of final payment should start being received by all those who pre-ordered the 1K5 radio.
And after a short wait for actual shipping, and any holidays and/or delays in Customs, everyone should start to receive their new 1K5 radios. Looking forward to seeing all the reviews, unboxing videos etc. And actually hearing those big signals on the air.
James
WD5GWY
And after a short wait for actual shipping, and any holidays and/or delays in Customs, everyone should start to receive their new 1K5 radios. Looking forward to seeing all the reviews, unboxing videos etc. And actually hearing those big signals on the air.
James
WD5GWY
Re: ANAN G2 1K5 Shipping Update
Trucker wrote:Looks like this week should be the big one. First post in this thread was on May 15th. Two to three weeks for receipt of the upgraded power supplies. And one more week for proper fitment and testing. That is now behind us, so notice of final payment should start being received by all those who pre-ordered the 1K5 radio.
And after a short wait for actual shipping, and any holidays and/or delays in Customs, everyone should start to receive their new 1K5 radios. Looking forward to seeing all the reviews, unboxing videos etc. And actually hearing those big signals on the air.
James
WD5GWY
73, Phil - VK1HX
Re: ANAN G2 1K5 Shipping Update
Oh ye of little faith!
Re: ANAN G2 1K5 Shipping Update
Trucker wrote:Looks like this week should be the big one. First post in this thread was on May 15th. Two to three weeks for receipt of the upgraded power supplies. And one more week for proper fitment and testing. That is now behind us, so notice of final payment should start being received by all those who pre-ordered the 1K5 radio.
And after a short wait for actual shipping, and any holidays and/or delays in Customs, everyone should start to receive their new 1K5 radios. Looking forward to seeing all the reviews, unboxing videos etc. And actually hearing those big signals on the air.
James
WD5GWY
I like her sense of humor
Re: ANAN G2 1K5 Shipping Update
For those waiting:
AL is still waiting for the arrival of the power supplies.
Apart from that, the radio's are finished.
AL is still waiting for the arrival of the power supplies.
Apart from that, the radio's are finished.
Re: ANAN G2 1K5 Shipping Update
Plantarum wrote:For those waiting:
AL is still waiting for the arrival of the power supplies.
Apart from that, the radio's are finished.
Right, source for this information?
James
WD5GWY
Re: ANAN G2 1K5 Shipping Update
I got the same information today from Abhi.
Jeffrey
Jeffrey
Re: ANAN G2 1K5 Shipping Update
NY4JF wrote:I got the same information today from Abhi.
Jeffrey
How about posting a copy of the notice you received? That might help others.
James
WD5GWY
Re: ANAN G2 1K5 Shipping Update
Hi Abhi,
I saw that AL is upgrading the G2 from a 7" screen to an 8" screen. Just wanted to know how this will affect the shipping of the G2 1K?
Also, any update on the shipping of the G2 1K?
Thanks,
Jeffrey
Hello Jeffrey,
Thank you for your email.
We are currently awaiting delivery of the upgraded PSUs for the 1K, the rest of the assembly is complete.
Hope that helps,
Regards,
Abhi
I saw that AL is upgrading the G2 from a 7" screen to an 8" screen. Just wanted to know how this will affect the shipping of the G2 1K?
Also, any update on the shipping of the G2 1K?
Thanks,
Jeffrey
Hello Jeffrey,
Thank you for your email.
We are currently awaiting delivery of the upgraded PSUs for the 1K, the rest of the assembly is complete.
Hope that helps,
Regards,
Abhi
Re: ANAN G2 1K5 Shipping Update
It's baffling that a company in the electronics field has so much trouble sending and receiving email. I'm glad to hear we're only a few weeks away from shipment again.
Re: ANAN G2 1K5 Shipping Update
Are the PSUs arriving on camel back?
Re: ANAN G2 1K5 Shipping Update
I2NOY wrote:Are the PSUs arriving on camel back?
- Attachments
-
- Guangzhou,_Chinese_Boats_by_Lai_Afong,_cа_1880.jpg (69.8 KiB) Viewed 5211 times
Re: ANAN G2 1K5 Shipping Update
I’m still betting on Xmas but not sure of what year ! Hihi
One thing is for sure this radio presale could have been handled better. But if they told you it’s going to be 2-3 years off they probably wouldn’t have received to much money for development. So it is what it is . My last post till I get my invoice .
73 everyone
Happy Waiting
AC9PA Byron
One thing is for sure this radio presale could have been handled better. But if they told you it’s going to be 2-3 years off they probably wouldn’t have received to much money for development. So it is what it is . My last post till I get my invoice .
73 everyone
Happy Waiting
AC9PA Byron
Re: ANAN G2 1K5 Shipping Update
NY4JF wrote:Hi Abhi,
I saw that AL is upgrading the G2 from a 7" screen to an 8" screen. Just wanted to know how this will affect the shipping of the G2 1K?
Also, any update on the shipping of the G2 1K?
Thanks,
Jeffrey
Hello Jeffrey,
Thank you for your email.
We are currently awaiting delivery of the upgraded PSUs for the 1K, the rest of the assembly is complete.
Hope that helps,
Regards,
Abhi
ABHI,
I hope you are feeling better! The last update - with timeframes - was that Final Invoices & Shipping - should begin by around June 14, 2024. It is great to read your statement: "We are currently awaiting delivery of the upgraded PSUs for the 1K, the rest of the assembly is complete." That is wonderful news!!! However, the PSUs were expected by June 3, 2024 - and it is now July 2, 2024 - so the PSUs are already 1 MONTH past due.
PLEASE, can you give us an update on when the PSU company is promising to deliver the new PSUs ... how long for Final Assembly ... when you expect to begin sending out FINAL INVOICES & when you expect to begin SHIPPING the ANAN G2-1K5?
WITH GRATITUDE & 73,
David
WR4N
ANAN 7000 DLE MKIII
Thetis 2.10.3.6 x64 (1/28/24) dev_2
HP VICTUS (Gaming Laptop) - Intel Core i7 - 16GB memory - 512GB SSD - NVIDIA Graphics - WINDOWS 10
Best 73s,
WR4N - David
Thetis 2.10.3.6 x64 (1/28/24) dev_2
HP VICTUS (Gaming Laptop) - Intel Core i7 - 16GB memory - 512GB SSD - NVIDIA Graphics - WINDOWS 10
Best 73s,
WR4N - David
Re: ANAN G2 1K5 Shipping Update
WR4N wrote:NY4JF wrote:Hi Abhi,
I saw that AL is upgrading the G2 from a 7" screen to an 8" screen. Just wanted to know how this will affect the shipping of the G2 1K?
Also, any update on the shipping of the G2 1K?
Thanks,
Jeffrey
Hello Jeffrey,
Thank you for your email.
We are currently awaiting delivery of the upgraded PSUs for the 1K, the rest of the assembly is complete.
Hope that helps,
Regards,
Abhi
ABHI,
I hope you are feeling better! The last update - with timeframes - was that Final Invoices & Shipping - should begin by around June 14, 2024. It is great to read your statement: "We are currently awaiting delivery of the upgraded PSUs for the 1K, the rest of the assembly is complete." That is wonderful news!!! However, the PSUs were expected by June 3, 2024 - and it is now July 2, 2024 - so the PSUs are already 1 MONTH past due.
PLEASE, can you give us an update on when the PSU company is promising to deliver the new PSUs ... how long for Final Assembly ... when you expect to begin sending out FINAL INVOICES & when you expect to begin SHIPPING the ANAN G2-1K5?
WITH GRATITUDE & 73,
David
WR4N
Maybe you should email this directly to Abhi. From all appearances, if looks like he rarely ever reads posts on this forum. You might have a better chance of getting a response. (as others have)
If you do get a reply, share it here that others waiting on the 1K5 might be encouraged.
James
WD5GWY
Re: ANAN G2 1K5 Shipping Update
Please read new message of Apache Labs News board section (Apache Labs Update on ANAN-G2 1K5 and 1K5 Linear Amplifier Shipping Status).
I propose to Abhi to transfer AL to L.A. and start a new branch of it as fictions' storyteller.
I propose to Abhi to transfer AL to L.A. and start a new branch of it as fictions' storyteller.
Re: ANAN G2 1K5 Shipping Update
It's my understanding that FCC approval is only needed if you sell radios INSIDE the U.S. Selling them from outside the U.S. I thought didn't require it. Am I wrong?
Nice to have so a USA rep can sell -- but no necessary.
I've bought all sorts of rigs that don't have FCC approval.
Nice to have so a USA rep can sell -- but no necessary.
I've bought all sorts of rigs that don't have FCC approval.
Mike W9MDB
Re: ANAN G2 1K5 Shipping Update
I don't have one of these on order, so this is just my opinion. Why would AL wait until NOW to make this decision? I have to say that planning is not their strong suit.
Re: ANAN G2 1K5 Shipping Update
You have to have a radio to test before getting FCC testing. Can't make any significant changes to it (e.g. power supplies).
So all the FCC testing indicates is they have locked down the design and components and actually have one to test.
So all the FCC testing indicates is they have locked down the design and components and actually have one to test.
Mike W9MDB